project profile
Project: Lake Union Addition
Location: Seattle, Wa
Scope: second story mezzanine addition + miscellaneous upgrades and sound proofing
Description:
This beautiful condominium overlooking Lake Union was looking to extend their second story mezzanine level to achieve more usable space on their second story. Numerous structural components were upgraded to allow for the proper support of the newly enclosed area. Much of the electrical and mechanical systems were upgraded as necessary in the work areas. Upgrading the sound proofing of the common walls was a major concern and extensive lengths were taken to ensure that the maximum soundproofing was achieved. In this instance numerous layers of sound rock were used in conjunction with extensive insulation upgrades to achieve these goals. New window glazing units were installed to increase the efficiency of the spaces and to increase the ventilation in the new spaces. A new custom metal handrail was created and installed to update the look of the new spaces. New flooring was installed throughout and all of the painting was done from wall to wall.
Location: Seattle, Wa
Scope: second story mezzanine addition + miscellaneous upgrades and sound proofing
Description:
This beautiful condominium overlooking Lake Union was looking to extend their second story mezzanine level to achieve more usable space on their second story. Numerous structural components were upgraded to allow for the proper support of the newly enclosed area. Much of the electrical and mechanical systems were upgraded as necessary in the work areas. Upgrading the sound proofing of the common walls was a major concern and extensive lengths were taken to ensure that the maximum soundproofing was achieved. In this instance numerous layers of sound rock were used in conjunction with extensive insulation upgrades to achieve these goals. New window glazing units were installed to increase the efficiency of the spaces and to increase the ventilation in the new spaces. A new custom metal handrail was created and installed to update the look of the new spaces. New flooring was installed throughout and all of the painting was done from wall to wall.